Left Right

PROJECT

PROJECT DONE BY JERUZETH – PHRC

Piping Modification of 6 inch X 383metres pipeline on FCC MCB and Area 5 Tanks 52TK63I/K to 51TKO6A-D Project. (Completed – November 2013)


 

PROJECT DONE BY JERUZETH – TOTAL UPSTREAM NIGERIA(TUPNI)

Detailed Engineering of Egina FPSO project through NETCO(Completed – May 2015).

Provision of 20 Expatriate key personnel and Logistics support on the Project by Jeruzeth.

 

PROJECT DONE BY JERUZETH – TOTAL UPSTREAM NIGERIA(TUPNI)
EGINA FPSO

 

PROJECT DONE BY JERUZETH – EXXONMOBIL

MIPS – EPCM2 Project: Provision of Technical Engineering Support Service, through NETCO (June 2014 – Till date).

Nine(9) Expatriate Key personnel were mobilized by Jeruzeth on the Project as well as Logistics Support.

 

PROJECT BY JERUZETH EXXONMOBIL

Provision of Security vessel service – MV Elijah (February 2015 – Till date). Over 97% Online Efficiency. Well managed to meet Field operational demand.

 

 

PROJECT BY JERUZETH – SNEPCO

Engineering Call-off Contract – To provide engineering support services to SNEPCO (Ongoing)

 

PROJECT BY JERUZETH – NPDC

Concept study and FEED for Provision of 100,000 BPD Buffer storage tank for Egbema, Egbema West and Ugada fields in OML 20 (Completed in December 2017).

 

HAZOP REVIEW BY NPDC & JERUZETH PROJECT TEAM